-Ambrosino, D. and Scutella, M. (2005) "Distribution network design: new problems and related models", European journal of operational research, Vol. 165, No. 3, pp. 610-624.
-Cheraghi, S., Hosseini-Motlagh, S. M. and Ghatreh Samani, M. R. (2016) "Integrated planning for blood platelet production: a robust optimization approach", Journal of Industrial and System Engineering, Vol. 10 (SI: Healthcare)
-Cheraghi, S. and Hosseini-Motlagh, S. M. (2016) "Optimal blood transportation in disaster relief considering facility disruption and route reliability under uncertainty", International Journal of Transportation Engineereing Vol. 4, No. 3, pp. 225-254.
-Golozari, F., Jafari, A. and Amiri, M. (2013) "Application of a hybrid simulated annealing-mutation operator to solve fuzzy capacitated location-routing problem", The International Journal of Advanced Manufacturing Technology, Vol. 67, No. 5-8, pp. 1791-1807.
-Holland, J. H. (1975) "Adaptation in natural and artificial systems", Ann Arbor, MI: University of Michigan Press.
-Held, M. and Karp, R. M. (1962) "A dynamic programming approach to sequencing problems", Journal of the Society for Industrial and Applied Mathematics, Vol. 10, No. 1, pp. 196-210.
-Hiassat, A., Diabat, A. and Rahwan, I. (2017) "A genetic algorithm approach for location-inventory-routing problem with perishable products", Journal of Manufacturing Systems, Vol. 42, pp. 93-103.
-Hosseini-Motlagh S, Cheraghi, S. and Ghatreh Samani, M. (2016) “A robust optimization model for blood supply chain network design. IJIEPR. Vol. 27, No. 4, pp. 425-444.
-Jacobsen, S. K. and Madsen, O. B. (1980) “A comparative study of heuristics for a two-level routing-location problem", European Journal of Operational Research, Vol. 5, No. 6, pp. 378-387.
-Jokar, A. and Hosseini-Motlagh, S.M. (2015) “Impact of capacity of mobile units on blood supply chain performance: results from a robust analysis”, International Journal of Hospital Research, Vol. 4, No. 3, pp.101-105.
- Karaoglan, I., Altiparmak, F., Kara, I. and Dengiz, B. (2009) “Formulations for a location-routing problem with simultaneous pickup and delivery”. Research paper,/http://w3. gazi. edu. tr/_fulyaal/Papers/LRPSPD_MIP Formulations.
- Karaoglan, I., Altiparmak, F., Kara, I. and Dengiz, B. (2011) “A branch and cut algorithm for the location-routing problem with simultaneous pickup and delivery”, European Journal of Operational Research, Vol. 211, No. 2, pp. 318-332.
- Karaoglan, I., Altiparmak, F., Kara, I. and Dengiz, B. (2011) “A branch and cut algorithm for the location-routing problem with simultaneous pickup and delivery”, European Journal of Operational Research, Vol. 211, No. 2, pp. 318-332.
-Laporte G (1988) Location Routing Problems. In: Golden B, Assad A (eds) Vehicle Routing: Methods and Studies, North-Holland, Amsterdam, pp. 293–318
-Liu, B. and Liu, Y. K. (2002) "Expected value of fuzzy variable and fuzzy expected value models", IEEE Transactions on fuzzy systems, Vol. 10, No. 4, pp. 445-450.
-Madsen, O. (1983) "Methods for solving combined two level location-routing problems of realistic dimensions", European Journal of Operational Research, Vol.12, No. 3, pp. 295-301.
-Majidi, S., Hosseini-Motlagh, S. M., Yaghoubi, S. and Jokar, A. (2017) " Fuzzy green vehicle routing problem with simultaneous pickup delivery and time windows", RAIRO-Operations Research.
DOI:https://doi.org/10.1051/ro/2017007.
-Majidi, S., Hosseini-Motlagh,S. M. and Ignatius, J. (2017) "Adaptive large neighborhood search heuristic for pollution routing problem with simultaneous pickup and delivery", Soft Computing.
DOI:https://doi.org/10.1007/s00500-017-2535-5
-Min, H., Jayaraman, V. and Srivastava, R. (1998) "Combined location-routing problems: A synthesis and future research directions", European Journal of Operational Research, Vol.108, No. 1, pp. 1-15.
-Nadizadeh, A. and Hosseini Nasab, H. (2014) "Solving the dynamic capacitated location-routing problem with fuzzy demands by hybrid heuristic algorithm", European Journal of Operational Research, Vol. 238, No. 2, pp. 458-470.
-Nagy, G. and Salhi, S. (2007) "Location-routing: Issues, models and methods", European Journal of Operational Research, Vol. 177, No. 2, pp. 649-672.
-Nambiar, J. M., Gelders, L. F. and Van Wassenhove, L. N. (1981) "A large scale location-allocation problem in the natural rubber industry", European Journal of Operational Research, Vol. 6, No. 2, pp. 183-189.
-Nikbakhsh, E. and Zegordi, S. H. (2010) "A heuristic algorithm and a lower bound for the two-echelon location-routing problem with soft time window constraints", Scientia Iranica Transaction E: Industrial Engineering, Vol. 17, No. 1, pp. 36-47.
-Nikkhah Qamsari, A. S., Hosseini-Motlagh, S. M., and Jokar, A. (2017) "A two-phase hybrid heuristic method for a multi-depot inventory-routing problem", International Journal of Transportation Engineering, Vol. 4, No. 4, pp. 284-304.
-Prodhon, C. and Prins, C. (2014) "A survey of recent research on location-routing problems", European Journal of Operational Research,Vol. 238No. 1, pp. 1-17.
-Riahi, N., Hosseini-Motlagh, S. M. and Teimourpour, B. (2013) " Three-phase Hybrid times series modeling framework for improved hospital inventory demand forecast" International Journal of Hospital Research Vol. 2, No. 3, pp. 130-138.
-Rieck, J., Ehrengerg, C. and Zimmerman, J. (2014) "Many-to-many location-routing with inter-hub transport and multi-commodity pickup-and-delivery", European Journal of Operational Research, Vol. 236, No. 3, pp. 863-878.
-Riquelme-Rodríguez, J., Gamache, M. and Langevin, A. (2016) " Location arc routing problem with inventory constraints", Computers and Operation Research, Vol. 76, pp. 84-94.
-Schiffer, M. and Walther, G. (2017) "The electric location routing problem with time windows and partial recharging", European Journal of Operational Research.
-Tavakkoli-Moghaddam, R., Raziei, Z. and Tabrizian, S. (2016) "Solving a bi-objective multi-product vehicle routing problem with heterogeneous fleets under an uncertainty condition", International Journal of Transportation Engineering, Vol. 3, No. 3, pp. 207-225.
-Wasner, M. and Zapfel, G. (2004) "An integrated multi-depot hub-location vehicle routing model for network planning of parcel service", International Journal of Production Economics, Vol. 90, No. 3, pp. 403-419.
-Watson-Gandy, C. D. T. and Dohrn, P. J. (1973) "Depot location with van salesmen a practical approach", Omega, Vol. 1, No. 3, pp. 321-329.
-Webb, M. H. J. (1968) "Cost functions in the location of depots for multiple-delivery journeys", Journal of the Operational Research Society, Vol.19, No. 3, pp.311-320.
-Zarandi, M. H. F., Hemmati, A., Davari, S., and Turksen, I. B. (2013). “Capacitated location-routing problem with time windows under uncertainty”, Knowledge-Based Systems, Vol.37, pp. 480-489.
-Zhu, H. and Zahng, J. (2009) "A credibility-based fuzzy mathematical programming model for APP problem" Artificial Intelligence and Computational Intelligence, AICI'09. International Conference on. IEEE, pp. 455-459.