-Baradaran, V. and Azarnia, S. (2013) “An approach to test concistency and generate wights from grey pairwise matrices in grey analytical heirachecical prosess”, The Journnal of Grey System, Vol 25, No. 2, pp.46-68.
-Boender, C. G. E., Graan, J. G. D. and Lootsma, F. A. (1989) "Multi-criteria decision analysis with fuzzy pairwise comparisons", Fuzzy Sets and Systems, Vol. 29, No. 2, pp.133–143.
-Bryson, N. and Mobolurin, A. (1997) "An action learning evaluation procedure for multicriteria decision making problems", European Journal of Operational Research, Vol. 96 , No.2), pp.379–386.
-Chapman, C. and Ward, S. (2003) "Project risk management: processes, techniques and insights", Second edition, USA, Wiely.
-Chen, M. F. and Tzeng, G. H. (2004) "Combining grey relation and TOPSIS concepts for selecting an expatriate host country", Mathematical and Computer Modelling, 40(13), pp.1473-1490.
-Chen, S. M., Munif, A., Chen, G. S., Liu, H. C. and Kuo, B. C. (2012) "Fuzzy risk analysis based on ranking generalized fuzzy numbers with different left heights and right heights", Expert Systems with Applications, 39(7), pp.6320-6334.
-Clark, R. C., Pledger, M. and Needler, H. M. J. (1990) " Risk analysis in the evaluation of non-aerospace projects", International Journal of Project Management, 8(1), pp.17-24.
-David, K. (1994) "Grey system and grey relational model ACM SIGCE bulletin", The Journal of Grey Systems, 20, pp.1-9.
-Deng, J. (1988) "Introduction to grey system theory", The Journal of Grey Systems, 1, pp.1-24.
-Ebrahimnejad, S., Mousavi, S. M. and Seyrafianpour, H. (2009) "Risk identification and assessment for build–operate–transfer projects: A fuzzy multi attribute decision making model", Expert Systems with Applications, 37(1), pp.575-586.
-Ergu, D., Kou, G., Shi, Y. and Shi, Y. (2014) "Analytic network process in risk assessment and decision analysis", Computers & Operations Research, 42, pp.58-74.
-Gogus, O. and Boucher, T. O. (1998) "Strong transitivity, rationality and weak monotonicity in fuzzy pairwise comparisons", Fuzzy Sets and Systems, 94(1), pp.133-144.
-Grassi, A., Gamberini, R., Mora, C. and Rimini, B. (2009) "A fuzzy multi-attribute model for risk evaluation in workplaces", Safety Science, 47 (5), pp.707-716.
-Hu, A. H., Hsu, C.-W., Kuo, T.-C. and Wu, W.-C. (2009) "Risk evaluation of green components to hazardous substance using FMEA and FAHP", Expert Systems with Applications Vool. 36, No. 3, pp.7142-7147.
-Klein, J. H. and Cork, R. B. (1998) "An approach to technical risk assessment", International Journal of Project Management, Vol.16, No.6, pp.345-351.
-Kumrua, M., Vitae, A. and Kumru, P. Y. (2013) "Fuzzy FMEA application to improve purchasing process in a public hospital", Applied Soft Computing Vol. 13, No. 1, pp.721-733.
-Kuo, Y., Yang, T. and Huang, G. W. (2008) "The use of grey relational analysis in solving multipile attribute decision making problem", Computers and Industrial Engineering, Vol 55, No. 1, pp.80-93.
-Kuo, Y. C. and Lu, S. T. (2012) "Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects", International Journal of Project Management, Vol.31, No. 4, pp.602-614.
-Kutlua, A. C. and Ekmekcioglu, M. (2012) "Fuzzy failure modes and effects analysis by using fuzzy TOPSIS-based fuzzy AHP", Expert Systems with Applications, Vol 39, No. 1., pp.61-67.
-Laarhoven, P. J. M. and Pedrycz, W. (1983) "A fuzzy extension of Saaty’s priority theory", Fuzzy Sets and Systems, Vol. 11, No.1-3, pp.199-227.
-Lambert, J. H., Haimes, Y. Y., Schooff, R. M. and Tulsiani, V. (2001) "Identification, ranking, and management of risks in a major system acquisition", Reliability Engineering and System Safety, Vol.72, No. 3, pp.315-325.
-Lavasani, S. M. M., Yang, Z., Finlay, J. and Wang, J. (2011) "Fuzzy risk assessment of oil and gas offshore wells", Process Safety and Environmental Protection, Vol. 89, No. 5, pp. 277-294.
-Li, G.-D., Yamaguchi, D. and Nagai, M. (2007) "A grey-based decision-making approach to the supplier selection problem", Mathematical and Computer Modelling, Vol. 46, No. 3-4, pp.573-581.
-Lin, Y. H., Lee, P. C. and Ting, H. I. (2008) "Dynamic multi-attribute decision making model with grey number evaluations", Expert Systems with Applications, Vol. 35, No. 4, pp.1638-1644.
-Liu, H. C., Liu, L., Liu, N. and Mao, L. (2012) "Risk evaluation in failure mode and effects analysis with extended VIKOR method under fuzzy environment", Expert Systems with Applications, Vol. 39, No. 17, pp.12926-12934.
-Liu, H. T. and Tsai, Y. l. (2012) "A fuzzy risk assessment approach for occupational hazards in the construction industry", Safety Science, Vol.50, No. 4, pp.1067-1078.
-Liu, S. and Lin, Y. H. (2006) "Grey information: Theory and practical applications", Springer-Verlag.
-Lo, C. C. and Chen, W. J. (2012) "A hybrid information security risk assessment procedure considering interdependences between controls", Expert Systems with Applications, Vol. 39, No. 1, pp.247-257.
-Makui, A., Mojtahedi, S. M. H. and Mousavi, S. M. (2007) "Introducing new and practical risk identification methods in infrastructure projects", Paper presented at the The first international risk congress, Tehran,Iran.
-Mikulak, R., McDermott, R. and Beauregard, M. (1996) "The Basics of FMEA", 2nd Edition
-Mohammadi, A. and Molaei, N. (2010) "Applying a multi criteria decision making model based on grey theory in performance evaluation of firms, Industrial Management, Vol. 2, No. 4, pp.125-142.
-Mojtahedi, S. M. H., Mousavi, S. M. and Makui, A. (2008). "Risk identification and analysis concurrently: Group decision making approach", Paper presented at the Fourth IEEE International Conference on Management Of Innovation and Technology, Bangkok.
-Redmill, F. (2002) "Risk anaysis, a subjective process", Engineering Management Journal, Vol. 12, No.2, pp.91-96.
-Shen, L.Y. (1997) "Project risk management in Hong Kong", International Journal of Project Management, Vol. 15, No. 2, pp.101–105.
-Shih, C. S., Hsu, Y. T., Yeh, J. and Lee, P. C. (2011) "Grey number prediction using the grey modification model with progression technique", Applied Mathematical Modelling, 35(3), pp.1314-1321.
-Tai, Y. Y., Lin, J. Y., Chen, M. S. and Lin, M. C. (2011) "A grey decision and prediction model for investment in the core competitiveness of product development", Technological Forecasting and Social Change, Vol.78, No. 7, pp.1254- 1267.
-Wang, Y. M. and Elhag, T. M. S. (2006) "Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment", Expert Systems with Applications, Vol. 31, No. 2, pp.309-319.
-Wang, Y. M. and Elhag, T. M. S. (2007) "A goal programming method for obtaining interval weights from an interval comparison matrix", European Journal of Operational Research, Vol. 177, No. 1, pp.458-471.
-Wang, Y. M., Elhag, T. M. S. and Hu, Z. (2006) "A modified fuzzy logarithmic least squares method for fuzzy analytic hierarchy process", Fuzzy Sets and Systems, Vol.157, No. 23, pp.3055-3071.
-Wang, Y. M., Liu, J. and Elhag, T. M. S. (2008) "An integrated AHP–DEA methodology for bridge risk assessment", Computers & Industrial Engineering, Vol. 54, No. 3, pp.513-525.
-Wei, G. (2011) "Grey relational analysis model for dynamic hybrid multiple attribute decision making", Knowledge-Based Systems, Vol.24, No. 5, pp.672-679.
-Yang, Y. P. O., Shieha, H. M. and Tzeng,
G. H. (2013) "A VIKOR technique based on DEMATEL and ANP for information security risk control assessment", Information Sciences, 232, pp. 482-500.
-Yucel, G., Cebi, S., Hoege, B. and Ozok, A. ( 2012) "A fuzzy risk assessment model for hospital information system implementation", Expert Systems with Applications, Vol.39, No. 1, pp.1211-1218.
-Zhang, Z. and Chu, X. (2011) "Risk prioritization in failure mode and effects analysis under uncertainty", Expert Systems with Applications, Vol. 38, No. 1, pp.206-214.