-Adams, W. F. (1936) “Road traffic considered as a random time series”, Journal of the Institution of Civil Engineers, Vol. 4, pp. 121-131.
-Austroads (2008) “Guide to traffic management Part 11: Parking”, AGTM11-08, Austroads, Sydney.
-Austroads (2016) “Guide to traffic management part 12: Traffic impacts of developments”, 2nd Edition. Austroads, Sydney.
-Black, J. (1981) “Urban transport planning: theory and practice”, Croom Helm, London and John Hopkins University Press, Baltimore.
-Black, J., C. Mason and K. Stanley (1999) “Travel demand management: an application by the university of New South Wales (UNSW) as a large trip generator”, Transport Engineering in Australia, Vol.4, pp. 61 – 72.
-Blunden, W. R. (1966) “On the traffic effects of frontage land uses on urban main roads and arterials. Proceedings, Australian Road Research Board, Vol. 3, Part 1, pp. 1-18.
-Blunden, W. R. and J. A. Black (1984) “The land-use/transport system”, 2nd Edition. Pergamon Press, Sydney.
-NAASRA (1970) “Guide to traffic engineering practice”, National Association of Australian State Road Authorities, Sydney.
-Naude, C., Lloyd , B. and Bennett, P. (2016) “Development of the traffic impact estimation Tool for Small Intersection Projects”. Austroads Publication No. AP-R522-16, Austroads, Sydney, August.
-NSW Roads and Traffic Authority (2002) Guide to Traffic Generating Developments, Version 2.2. NSW Roads and Traffic Authority, Sydney, October.
-NSW RTA (1999) Sharing the Main Street. (NSW Roads and Traffic Authority, Sydney.
-Queensland Government, Department of Main Roads (2006) “Guidelines for assessment of road impacts of development. the state of Queensland (Department of Main Roads), Brisbane.
-San Jose, Silicon Valley (2009) “Traffic Impact Analysis Guidelines”.
-Smith, E. A. and K. Tara (1990) Who Should Pay the Transportation Infrastructure Needed for New Developments? 15th ARRB Conference, Darwin, Northern Territories, 26 -31 August, 1990, Proceedings Part 1 – 7, pp. 17 – 31.
-Tanner, J. C. (1961) Theoretical Analysis of Delays at Uncontrolled Intersections. RRL Research Note RN 3937/JCT, Road Research Laboratory, Crowthorne, Berkshire.
-Tasmania. Department of Infrastructure, Energy and Resources Roads and Traffic Division (2007) “A framework for undertaking traffic impact assessments”. Department of Infrastructure, Energy and Resources, Roads & Traffic Division, Hobart, October.
-Tripp, Sir H. Alker (1942) “Town planning and road traffic”, Edward Arnold, London.
-US Department of Transportation (2009) “structuring modeling and simulation analyses for evacuation planning and operations”, Department of Transportation, Washington, D. C.
-Urban Research and Planning (1999) “Environmental and planning assessment act 1979: Leichhardt Developer Contributions Plan – Transport and Access”, URaP Pty Ltd, St Leonards, NSW.
-Vicroads (2015) “Supplement to Austroads Guide to Traffic Management - Part 12: Traffic Impacts on Developments (2009), Vicroads, Melbourne.
-Western Australia, Department of Planning and Western Australian Planning Commission (2016) “Transport impact assessment guidelines”, Western Australian Planning Commission, Perth, August.
-Wisconsin Department of Transport (2017), Traffic Impact Analysis Guidelines.