Identification and Prioritization of Road Project Risks using the Failure Modes and Effects Analysis Method in a Fuzzy Environment

Document Type : Research Paper

Authors

1 Department of Civil Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran

2 Department of Industrial Engineering, Electronic Branch, Islamic Azad University, Tehran, Iran

3 Department of Mathematical, South Tehran Branch, Islamic Azad University, Tehran, Iran

Abstract

A dynamic, efficient transportation network is an important index of country development and currently, major parts of infrastructure projects-related credits and budgets are allocated to road construction projects. Since several risks divert such projects, during their construction, from their main goals, proper risk identification and management are necessary to better implement infrastructure and road construction projects. As risks are changeable factors that differ from country/region to country/region, this research has reviewed the literature and used the experts' opinions to identify the most influential ones in Iran to eliminate or reduce their effects on the time and cost of road construction projects. To this end, a questionnaire was designed to identify the risks and prioritize them using the failure modes and effects analysis method in a fuzzy environment; defuzzification was done by MATLAB Software. Scores of the risks revealed that: 1) inflation (increased material price), 2) late financial provisions, 3) deficiency, failure, or defect of equipment/machinery, and 4) Maps and specification changes of more than 25% with respect to the values specified in the general conditions of contract due to the employer’s incorrect studies/estimation of the project, were identified as the most important risks of road construction projects.

Keywords


AIAG, A. (2008). Odette announces release of updated Global Materials Management Operations Guideline /Logistics Evaluation (MMOG/LE). July 24, 2006.
 
Abbasian Jahromi H.R., Najaf Ali E., Ebrahimi R. (2017), Identifying and prioritizing critical delay factors in road construction projects using risk matrix (case study of Qom province), 5th International Congress on Civil Engineering, Architecture and Urban Development, Tehran (In Persian).
 
Alhomidan, A. (2013). Factors affecting cost overrun in road construction projects in Saudi Arabia. International Journal of Civil & Environmental Engineering, 13(3), 1-4.
 
Ammar, T., Abdel-Monem, M., & El-Dash, K. (2022). Risk factors causing cost overruns in road networks. Ain Shams Engineering Journal, 13(5), 101720.
 
Baghelani M., Nouri A., Kia A. (2017), Analysis and review of solutions related to the risks of road construction projects using fuzzy logic, The first national conference of architecture, civil engineering and urban environment, Hamedan, Hegmatane Environmental Assessors Association (In Persian).
 
Basiri H., Rahsepar M. (2017), Investigating the risks identified in road construction projects with BOT contracts, National Research and Development Conference in Civil Engineering, Architecture and Modern Urbanism, Tehran (In Persian).
Ben, S. O. (2019). Significance of Road Infrastructure on Economic Sustainability. American International Journal of Multidisciplinary Scientific Research, 5(4), 1-9.
 
Cavalieri, M., Cristaudo, R., & Guccio, C. (2019). Tales on the dark side of the transport infrastructure provision: a systematic literature review of the determinants of cost overruns. Transport Reviews, 39(6), 774-794.
 
Cox, C. O. (2021). Decision Making in Risk Management: Quantifying Intangible Risk Factors in Projects. CRC Press.
 
-Dehghani J., Keramati M.A. (2015), Identifying the risks of road construction projects and providing solutions to reduce them, International Conference on Man, Architecture, Civil Engineering and the City, Tabriz (In Persian).
 
El-Sayegh, S. M., & Mansour, M. H. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering, 31(6), 04015004.
 
Eunchang L., Yongtae P., Jong Gye S. (2009). Large engineering project risk management using a Bayesian belief network. Expert Systems with Applications. 36, pp. 5880-5887.
 
Faraji M., Hosseini M., Rahimof K. (2017), Evaluation of risk factors in road construction projects. Case Study: Mazandaran Province, International Conference on New Advances in Civil Engineering, North Amol University (In Persian).
 
Islam, M, Nepal, M, (2017), Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects, Advanced Engineering Informatics journal, Volume 33, August 2017, Pages 112-131.
Javadi M., Faezi F., Khobeyri M. (2015), Investigation and ranking of intra-project risks in BOT and road construction projects, The national center of Iran's Architectural Engineers Associations, the second national conference on architecture, civil engineering and modern urban development in Urmia (In Persian).
 
Kermanshachi, S., & Safapour, E. (2020). Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment. Practice Periodical on Structural Design and Construction, 25(1), 06019004.
 
Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2016). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of management in engineering, 32(1), 04015032.
 
Mohajeri Borje Ghaleh, R., Pourrostam, T., Mansour Sharifloo, N., Majrouhi Sardroud, J., Safa, E. (2020). 'Reviewing Causes of Delay from the Risk Management Perspective in Execution Stage in Road Construction Projects (Case Study: Garmsar-Simin Dasht Road)', Civil and Environmental Researches, 5(2), pp. 69-82. doi: 10.22091/cer.2020.5274.1196.
 
Naghibi Kh., Hasanpour M. (2017), Analysis and evaluation of risk management of road construction projects using FMEA method according to PMBOK, 5th International Congress on Civil Engineering, Architecture and Urban Development, Tehran (In Persian).
 
Osei-Kyei, R., & Chan, A. P. (2017). Implementing public–private partnership (PPP) policy for public construction projects in Ghana: critical success factors and policy implications. International journal of construction management, 17(2), 113-123.
Project Management Institute. (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-and the Standard for Project Management. Project Management Institute.
 
Rajabinejad P., Rad Kia S. (2016), Risk management of factors influencing the occurrence of delays in road construction projects (case study: road construction projects in the Ramhormoz-Behbahan area), The first national conference on applied research in civil engineering (structural engineering and construction management), Tehran, Sharif University of Technology (In Persian).
 
Rezaee Arjoody, A., Hosseini, S. A., Akhbari, M., Safa, E., & Asadpour, J. (2022). Analyzing the Effects of Critical Risk Occurrence Probability on Time and Cost of Road Construction Projects Using a Schedule Plan. International Journal of Transportation Engineering.
 
Sadeghi Googhari M., Mohamadizadeh M., (2019), Identification and assessment of risk and management in road construction projects, a case study: Sirjan roads, 6th national conference of applied researches in civil engineering, architecture and urban management and the 5th specialized mass exhibition of housing and building builders in Tehran province, Tehran. (In Persian).
 
Shariatnia R., Riazi R. (2017), Factors affecting the time delay of road construction projects leading to the city with a fuzzy approach (case study of Dehdasht city), The fifth scientific research congress of new horizons in the field of civil engineering, architecture, culture and urban management of Iran, Tehran (In Persian).
 
Soltanpanah H., Sohrabi M. (2015), Identification and risk management of road construction projects, a case study of Khorram Abad-Kohdasht highway, International Conference on New Achievements in Civil Engineering, Architecture, Environment and Urban Management, Tehran, Institute of Ide Pardaz Capital Vira Directors (In Persian).
 
Tran, D. Q., & Molenaar, K. R. (2014). Impact of risk on design-build selection for highway design and construction projects. Journal of Management in Engineering, 30(2), 153-162.
 
Yazdani Moonaki E., Ghahremanifar S. (2018). Review and evaluation of risk management in road construction projects, International Conference on Civil Engineering, Architecture and Urban Development Management in Iran, Tehran (In Persian).